• Portfolio
  • Federal
  • Housing
  • Education
  • Public Facilities
  • Parks/Recreation
  • Community
  • Office/Retail
  • Health Care
  • Hospitality
  • Mobility
  • Project List
  • ---
  • Our Firm
  • Departments
  • People
  • Contact
  • Blog

Project List

Filter By:   
Featured Project = Featured Project    Project = Project
Page 1 of 22 | next >
Title Location Sectors Services
A Children's Village Campo, CA Community Planning, Landscape Architecture
Project Description:

Housing for foster care children, including an on-site school and chapel, sports fields, and administrative and medical facilities on 117 acres. Native and site specific vegetation will be used throughout the site, focusing on fire management practices and preservation of groundwater resources.

 
Client: St. Vincent de Paul
Status: In Progress
Completion Year:
Key Personnel: Michael Singleton
A/E Europe Naples, Italy Federal Planning
Project Description:

KTU+A prepared basic facilities requirements for NAVFAC in Naples Italy.

 
Client: NAVFAC Atlantic, GSIPT
Status: Complete
Completion Year: 2008
Ardath Road Realignment La Jolla, CA Public Facilities Landscape Architecture
Project Description:

"The Ardath Road project included the reconfiguration of this heavily traveled intersection at North Torrey Pines Road to improve traffic safety and to create a gateway into La Jolla. Project alternatives were presented to the community at a public workshop. The selected project alternative included the relocation of the existing mature Torrey Pine trees that were boxed and stored for protection during the  two year construction period. These trees were replanted in a similar massing formation as they were originally located.

Entering into La Jolla, the stately Canary Island Palm trees aligning both sides of Ardath Road create a strong entry statement along with the  broadheaded canopy and accent trees. The understory plant material is low growing with a variety of colors and textures for visual interest."

 
Client: City of San Diego
Status: Complete
Completion Year: 2001
Key Personnel: Cheri Blatner-Pifer
Ballpark Infrastructure Improvements and Tailgate Park San Diego, CA Public Facilities
Project Description:

"The Ballpark Infrastructure Project was constructed in the heart of the developing ‘East Village’ in downtown San Diego. The project included selective improvements on existing and proposed streets surrounding Petco Park. KTU+A’s scope included design development of multiple streets and park areas based on the conceptual master plan; and construction documents and construction administration for the streetscapes from Harbor Drive to Library Circle at the crossing of 12th Avenue, Tailgate Park, temporary parking areas D1 and D2, and the connection to the Linear Park and the nearby trolley station. KTU+A’s main challenge was to maintain the design intent of the approved San Diego’s Ballpark Neighborhood Streetscape Master Plan (November 1999) and the changes agreed to by the multiple stakeholders. The coordination with multiple stakeholders was of the utmost importance in this process. Ensuring that the City of San Diego, the Padres’ organization, Centre City Development Corporation, Environmental Health Coalition, East Village, private developers, and other stakeholders concerns and standards were incorporated in the construction documents was a driving force on the project.

KTU+A provided a full scope of landscape architectural services for Tailgate Park, an important pedestrian connection to Petco Park.  The urban design aspects respond to the major growth the area is experiencing now, and will see in the future. The site is encompassed by a trellis system, including a major trellis portal through which Park users access routes to the stadium. A series of formal gardens enhance use of the parking lot where users enjoy the “tailgate” experience of causal BBQ’s and get-togethers.

"

 
Client: City of San Diego
Status: Complete
Completion Year: 2004
Cal State San Marcos ADA Accessibility Plan San Marcos, CA Education, Mobility Planning
Project Description:

KTU+A reviewed the existing accessibility of the external circulation system, along with the existing wayfinding and signage program. Major phases included:

Review of the campus master plan guidelines for architectural elements, universal access and sustainability policies.

Documented and evaluated existing and proposed future campus accessibility paths-of-travel.

Code compliance review (Title 24, 2007 CBC, ADA, etc.) using the following references and checklists:

• Assessment Tools for Accessibility by Peter A. Stratton, Steven Winter Associates, Inc. Last updated: 02-12-2007.

•Existing Facilities version 2.1© revised August 1995, Adaptive Environments Center, Inc. for the National Institute on Disability and Rehabilitation Research.

• Americans with Disabilities Act Accessibility Guidelines (ADAAG) Checklist for Buildings and Facilities (ADAAG Checklist).

Prepared a campus path-of-travel plan for DSA review at the state level.

Completed a campus wayfinding program including the identification of areas of clear legibility, areas of confusion, perceptual or cognitive layout of the campus, inventory of signage, and areas requiring signage.

Prepared recommendations for ADA conformance, transition strategies, hierarchical signage program, campus map program, and building and signage adjustments to improve clarity and communication.

 
Client: California State University San Marcos
Status: Complete
Completion Year: 2012
Key Personnel: Michael Singleton
Page 1 of 22 | next >